PT. Baruna Raya Logistics Marks Milestone with Keel Laying Ceremony for New Utility Vessel in China

JAKARTA — PT. Baruna Raya Logistics has officially commenced the construction of its newest fleet addition following a successful Keel Laying Ceremony held in China on September 4, 2015. The landmark event was attended by high-ranking dignitaries from the shipbuilding company alongside key members of Baruna Raya’s management team.
Technical Progress & Project Timeline
The construction phase is progressing rapidly, with major initial production milestones already completed:
- Fabrication & Structural Assembly: Core hull structures and framework are under active construction.
- Coating & Preservation: The first coat of protective marine paint has been successfully applied to shield the vessel against harsh offshore environments.
- Piping System Installation: Initial piping networks and essential internal systems are currently being fitted.
- Target Delivery: The newly built Utility Vessel is scheduled to complete sea trials and arrive in Jakarta in late 2016.
Expanding Support for the Offshore Oil & Gas Sector
This latest investment directly aligns with PT. Baruna Raya Logistics’ long-term growth strategy to continuously modernize and diversify its fleet. By introducing state-of-the-art utility vessels, the company strengthens its capability to meet the complex, high-demand operational needs of leading oil and gas operators.
In line with Baruna’s uncompromising operational philosophy, the new vessel will fully adhere to the company’s rigorous Safety Management Manual (SMM) and International Safety Management (ISM) standards, ensuring maximum safety, efficiency, and reliability for crew and passengers alike.
